Reports > Load Monitoring System
ITRC Report No. R 01-002
Load Monitoring System
Sponsor: California Energy Commission
Download at DigitalCommons
Arvin-Edison Water Storage District received a loan - from the CEC's loan program for the development of new energy conservation technology - in 1995 to develop a program with variable frequency drives. This report discusses the design of the "Load Monitoring System", cost, the need for such a system, initial start-up challenges, configuration options, and benefits.
Irrigation Training & Research Center. 2001. Load Monitoring System. ITRC, California Polytechnic State University, San Luis Obispo, California, USA. ITRC Report No. R 01-002. 8 pp.
Acrobat Reader is required to open this file. If Acrobat Reader is not installed in your system, click here for a free download.